| A. | Receive Engineering Report from Tetra Tech, Inc., Project WC-0930, water transmission main and Booster Station No. 9 improvements for Draper-Hefner system interconnection, 7628 West Reno Avenue; and authorize engineering services.
|
| B. | Request for Proposals to be advertised (RFP OCWUT 08-21), fats, oils, and grease reduction services.
One or more files are marked confidential or are not available at this time.
|
| C. | Request for Proposals to be advertised (OCWUT 16-20) for Communication Planning and Development Services.
One or more files are marked confidential or are not available at this time.
|
| D. | Performance Bond for RFIP, Inc. (C219010), ethernet radios, replacement, and on-going maintenance services.
|
| E. | Ratifying and approving Addendum No. 1; awarding a contract to Wynn Construction Company, Inc., Project SC-1001-3, Draper Lift Station, Draper Water Treatment Plant, $1,608,021; and approving the contract and bonds.
One or more files are marked confidential or are not available at this time.
|
| F. | Ratifying and approving Addendum No. 1; awarding a contract to Jenco Construction Company, Project WM-0340, new restroom facility, Lake Stanley Draper Marina, $184,564.70; and approving the contract and bonds.
One or more files are marked confidential or are not available at this time.
|
| G. | Ratifying and approving Addendum No. 1; awarding a contract to Downey Contracting, LLC, Project WT-0245, Hefner clearwell improvements, Hefner Water Treatment Plant, $794,793; and approving the contract and bonds.
One or more files are marked confidential or are not available at this time.
|
| H. | Reject Bids, (OCWUT 30-20), for unit price water main construction 24-inch to 36-inch.
One or more files are marked confidential or are not available at this time.
|
| I. | Professional Services Agreement with West Monroe Partners, LLC (C219008), water metering services, April 13, 2021, through April 12, 2026, estimated cost $539,000.
One or more files are marked confidential or are not available at this time.
|
| J. | Amendment No. 7 to Contract for Engineering Services with Enercon Services, Inc., Projects WC-0650, parallel Atoka Pipeline Environmental Study, Lake Draper to Lake Atoka, along the existing alignment of the Atoka Pipeline, and WY-0014, Environmental and Cultural/Archaeological Assessments, Atoka Reservoir to McGee Creek Reservoir along the existing alignment of the McGee Creek Pipeline easement, fee increase of $558,974.
|
| K. | Change Order No. 3 revising the construction contract with Shiloh Enterprises, Inc., Project SM-0239, Utilities Department office space remodel, 420 West Main Street, fifth floor, increase of $93,437.41.
|
| L. | Amendment No. 2 revising the construction contract with United Trenching, Inc., Project SC-1082, emergency 12-inch sanitary sewer repair, 9528 W I-40 Service Road, increase of $7,826; and accepting the project and placing the maintenance bond into effect.
|
| M. | Amendment No. 1 revising the construction contract with Wynn Construction Company, Inc., Project ST-0155, Structure 11 (Switchgear) rehabilitation, North Canadian Wastewater Treatment Plant, decrease of $952,401.67; and accepting the project and placing the maintenance bond into effect.
|
| N. | Final Acceptance with the Oklahoma City Economic Development Trust, The City of Oklahoma City, and RDNJ, LLC dba A-Tech Paving, Projects PC-0399(17) and WC-0915, Project 180 Streetscape Package 8, Broadway Avenue from Main Street to Robert S. Kerr Avenue, Main Street from Broadway Avenue to Robinson Avenue, and Robert S. Kerr Avenue from North Walker Avenue to North Hudson Avenue; accepting the project and placing the maintenance bond into effect.
|
| O. | Joint Resolution with The City of Oklahoma City declaring certain land located at the Lake Hefner Reservation north of Hefner Road between Portland Avenue and Meridian Avenue be surplused to the needs of the Oklahoma City Water Utilities Trust; approving a real estate sales agreement with a purchase price of $1,918,999; and granting a warranty deed to The City of Oklahoma City.
|
| P. | Resolution approving the Sole Source Agreement and the Statement of Work with Innovyze, Inc. (SS21-C219031), for the purchase of software packages, including upgrades and annual licenses, related services, configurations, and maintenance, estimated annual cost $400,000, April 13, 2021, through April 12, 2026.
|
| Q. | Resolution to receive and approve the Lake Atoka Reservation Association Fiscal Year 2022 Budget.
|
| R. | Receive the resolution adopting the McGee Creek Authority Fiscal Year 2022 budget, capital improvement projects, and proposed pay plan; and directing the General Manager to implement and administer the budget, capital improvement projects, and proposed pay plan, including but not limited to development of plans, specifications, bid solicitations, bid evaluations, contract negotiations, and award recommendations in accordance with the McGee Creek Authority Purchasing Policy and Procedures; and delegating to the Chairman the authority to award and execute contracts as needed, which comply with applicable law and do not exceed the funds available in the McGee Creek Authority Fiscal Year 2022 budget, pursuant hereto for ratification by the Trustees.
|
| S. | Fiscal Year 2022 Loan Agreement with the McGee Creek Authority, AC-21-0002-LA estimated cost $3,332,666.70.
|
| T. | Receive the Oklahoma Turnpike Authority Utility License 121, Project WC-0982, waterline replacement, Memorial Road and Lake Hefner Parkway.
|
| U. | Oklahoma Department of Environmental Quality Permit to Construct, Project WC-0982, waterline replacement, Memorial Road and Lake Hefner Parkway.
|
| V. | 1. Recommend The City of Oklahoma City accept an easement, Project ST-0138, South Canadian Wastewater Treatment Plant improvements; and
2. Authorize payment of claim, $196,650.
|
| W. | Change Order No. 4 and Amendment No. 5, revising the construction contract with Downey Contracting, LLC, Projects M3-C010, South Robinson Avenue reconstruction, WC-0970 and WC-0979, waterline replacement, PC-0728, South Robinson Avenue resurfacing, and DC-0303, storm sewer relief main, Robinson Avenue from the Oklahoma City Boulevard to I-40, increase of $43,968.14. (No OCWUT funds.)
|
|
|